Update
Updated post-quantum guidance: check supplier evidence
ASD's 5 November guidance update prompts a practical supplier conversation: identify the service, separate plans from tested evidence and keep dependencies visible.
Contrata editorial team ·
On 5 November 2026, the Australian Signals Directorate announced refreshed guidance on discussing post-quantum cryptography with vendors, developed with the United States' CISA and NSA. ASD describes the update as adding background and clearer transition context. The announcement concerns an existing publication, first published in July; it is not the first release of the vendor questions.
Post-quantum cryptography (PQC) aims to resist attacks from both classical and quantum computers, as NIST explains. For an insurer or super fund reviewing a technology supplier, the immediate task is to find out what a readiness claim covers. A roadmap presentation, a supported software release and a successful test in your service answer different questions. Keep those distinctions in the review record.
A fictional managed-service review
Consider a fictional insurer using a managed document service. Its supplier sends a presentation headed “PQC roadmap”. The presentation names an upcoming application release, but says nothing about the gateway used to exchange files with the insurer.
The reviewer records the application release as a planned change. She leaves the gateway's readiness unresolved and asks the supplier's technical contact to confirm its product, version and upstream owner. She also asks whether the presentation covers the insurer's hosted environment or a separate demonstration environment.
The supplier then provides release notes for the application and explains that the gateway depends on another provider's schedule. There is still no end-to-end test record for the insurer's connection. The evidence has improved: the dependency is visible and the application claim has a clearer boundary. The overall service has not been shown to be ready.
The insurer's technology owner now has a specific task: agree a test scope and identify what cannot yet be tested. The supplier relationship owner asks for an update when the gateway schedule changes. The risk reviewer retains both open items with owners and review dates. Filing the presentation does not close them.
This example illustrates evidence handling, not a prescribed migration design or a real supplier assessment. It does not recommend particular algorithms or establish that a service is quantum-safe.
Take a service boundary into the conversation
Before the meeting, write a short scope statement: the contracted service, the systems it connects to and the information it handles. Bring the technology owner into the discussion. A risk reviewer can organise the evidence and unresolved decisions; evaluating cryptographic design needs appropriate technical expertise.
The current ASD/CISA/NSA vendor publication addresses inventories, dependencies, transition plans, production availability and customer communications. Use these editorial meeting prompts alongside its fuller questions.
| Ask the supplier | Evidence to connect to the answer |
|---|---|
| Which products and versions support our service? | A dated service boundary, including exclusions. |
| Which upstream components affect that answer? | A dependency record with unresolved items identified. |
| What is available now, and what remains planned? | Supported release information separated from roadmap commitments. |
| What would our organisation need to change? | Customer actions, prerequisites and responsible contacts. |
| What has been tested for our use? | The environment, interfaces, results and limitations. |
| What happens when a milestone moves? | A notification route, owner and next review point. |
NIST's migration project treats cryptographic visibility and risk management as one workstream, and interoperability and benchmarking as another. Use that separation in the meeting: finding the dependencies does not establish that a replacement will work with your systems.
Ask which components and connections were tested
The BIS Innovation Hub's Project Leap phase 2, reported in December 2025, explored post-quantum cryptography in a payment system. The BIS project account describes changes across multiple components and higher processing time in its experiments. That is useful financial-sector research on migration and compatibility, not evidence about any particular insurer's or super fund's supplier.
Ask your technical reviewer what those kinds of changes would mean for the service under review. A supplier's successful demonstration may be relevant while leaving your connection, workload or recovery process outside the test.
Put the dates in their proper context
The vendor guidance refers to the end of 2030. Its footnote explains that this reflects ASD transition objectives and is a planning milestone for vendor discussions; applicable jurisdiction, sector and risk context still matter. Do not turn that reference into a universal supplier deadline or describe this guidance update as a new APRA requirement.
For a lean team, add a scoped follow-up to the existing third party risk assessment questionnaire where the service warrants it. Keep detailed technical material in the appropriate restricted evidence store. Where an answer remains unclear, use a targeted supplier evidence follow-up that names the missing component or untested connection. Record what the next response needs to resolve before deciding that the item can close.